Randwick Semi Renovation & Addition | Progress Video 6
This video has been taken one week before handover. The cast-iron security gate and hand rails have been installed. The landscaping elements are being finalised,...
This video has been taken one week before handover. The cast-iron security gate and hand rails have been installed. The landscaping elements are being finalised,...
This week's video looks at the finishing touches: ensuite bathroom - joinery and stonework has now been installed, mirrors to the back have been ordered....
This week we can see the kitchen joinery, electrical, side panelling (in construction, which will be up by next week's upload) and back pergola -...
This week's progress includes (but is not limited to) the inserted tile drain outlets on the balconies, aircon grilling, decking and balustrade to overhanging decking...
Today''s video looks at a freshly set concrete slab and staircase at the front, the cantilevered timber deck at the back, concrete slab waterproofing at...
Domus Homes is starting a progress vlog at our Randwick Semi in Sydney, Australia! You'll get to see the tail-end of this project during its...
[gallery columns="2" size="large" ids="3371,3189,3370,3185"] ...
Renovations to the existing california bungalow included the construction of a new bathroom, laundry and study, plus general painting and ceiling repairs. The client innially...
Only the front room was retained for this sleek, north facing contemporary semi renovation and first floor addition. A new garage was constructed at ground floor...
The existing single storey federation house was transformed by a ground floor renovation and extension and first floor addition. The ground floor renovation incorporated a...